Skip to Content

Rock Climbing Photos : Search Results

Photos by vtemple

Your search returned 0 categories and 13 photos

Photos

New Wall Finished

Average Rating = 0.00/5 New Wall Finished

I ripped down the cave and just built a 8 x 10 about 35 degrees off verticle
Submitted by: vtemple on 2005-01-03
Views: 647 | Comments: 0
All Painted and finished

Average Rating = 0.00/5 All Painted and finished

I re-painted both walls and added texture to both.
Submitted by: vtemple on 2005-01-03
Views: 589 | Comments: 0
Phase 2 of wall finished....

Average Rating = 2.00/5 Phase 2 of wall finished....

Here is the finished phase 2 I climbed it for about 3 months every other day and the people on the site were right. It gets old fast. It was more fun as just one 8x10 wall then with the angles and closed in space. The minivan is huge.
Submitted by: vtemple on 2004-10-13
Views: 710 | Vote: 1 | Comments: 0
Garage Home Wall Phase 2

Average Rating = 2.00/5 Garage Home Wall Phase 2

All finished with the Minivan just need some roof holds but they are on there way
Submitted by: vtemple on 2004-08-17
Views: 935 | Vote: 1 | Comments: 0
Starting the Second Phase of the Garage Wall

Average Rating = 2.00/5 Starting the Second Phase of the Garage Wall

Here is a shot of the roof and the new angles before plywood. Gonna take everyones advise and put the t-nuts in a more random layout.
Submitted by: vtemple on 2004-08-12
Views: 657 | Vote: 1 | Comments: 0
My buddy Dan and the wall.

Average Rating = 3.00/5 My buddy Dan and the wall.

Here is a shot of the Dan after we had to stop cutting wood after a few beverages. Didn't want to wake up the neighbors.
Submitted by: vtemple on 2004-08-12
Views: 696 | Vote: 1 | Comments: 0
Nice side shot of the wall.

Average Rating = 2.00/5 Nice side shot of the wall.

Here is a shot of the roof and the new angles before plywood. Gonna take everyones advise and put the t-nuts in a more random layout.
Submitted by: vtemple on 2004-08-12
Views: 1428 | Vote: 1 | Comments: 0
All Finished

Average Rating = 3.00/5 All Finished

All the panels are up and some holds are on to try it out. Just need a pad...
Submitted by: vtemple on 2004-05-06
Views: 1412 | Votes: 2 | Comments: 3
Framing with 2 4x4 Panels On

Average Rating = 2.00/5 Framing with 2 4x4 Panels On

I used Home Depot Texture Paint it came out alot darker than I thought. On the next side I am going to use a much lighter color and touch up the red side with some lighter color.
Submitted by: vtemple on 2004-05-04
Views: 722 | Votes: 2 | Comments: 0
Framing with 4 4x4 Panels On

Average Rating = 2.50/5 Framing with 4 4x4 Panels On

Almost done I have all the 4x4 panels up. Just the 2 4x2's to go.
Submitted by: vtemple on 2004-05-04
Views: 744 | Votes: 2 | Comments: 0
Framing

Average Rating = 2.00/5 Framing

Side View of the initial frame. Before all of the blocking.
Submitted by: vtemple on 2004-05-04
Views: 1209 | Vote: 1 | Comments: 0
Big Pile of Atomik Holds

Average Rating = 3.00/5 Big Pile of Atomik Holds

All the holds for the new wall laying on the ground just waiting to be put up.
Submitted by: vtemple on 2004-05-04
Views: 792 | Vote: 1 | Comments: 0
All Finished with pad.

Average Rating = 0.00/5 All Finished with pad.

All the holds are up and got 6 in 4 x 8 of open cell at local foam store for 150 gonna cover it with carpet and a tarp. About 170 total for a really good pad beats 220 plus 80 bucks shipping for a gym pad. Dirty old mattresses scare me.
Submitted by: vtemple on 2004-05-01
Views: 842 | Vote: 1 | Comments: 0