Skip to Content

critical path -

Average Rating = 0.00/5 Average Rating : 0.00 out of 5
Route sequence (left to right):
Route Summary | Ascent Notes (0)
Premier Sponsor:
G
Consensus Ratings
  Difficulty (Not Rated)
  Safety Rating (Not Rated)
  Exposure (Not Rated)
  Rock Quality (Not Rated)
  Scenery (Not Rated)
  Fun Factor (Not Rated)

Description:

stand start to glory roof project - start on jug with feet on slab, swing, and top out boulder all the way left at the point, same topout as glory nights.

Submitted by: paleolithics on 2008-02-11
Views: 287
Route ID: 92092