climb4free
Jul 30, 2012, 4:04 PM
Views: 21285
Registered: Apr 11, 2007
Posts: 283
|
Day 6 - Finished off the plywood install on the 45* & 28* walls. Installed 0*/Vert sidewall on the left of the 45*. I am getting some skateboard grip tape to have a 3" strip at the lip for bumping up the arete. Installed the bottom half of the transition wall. This "Ninja" wall is the one piece of plywood that has now been utilized in all 3 versions. Up next is final install of plywood on the 23* wall, the far right arete, and the top half of the transition wall. (there may be another step after involving an extension, but we'll see)
(This post was edited by climb4free on Jul 30, 2012, 4:16 PM)
|